RISK MANAGEMENT AND PERFORMANCE OF ROAD BUSANZA -MUYANGE CONSTRUCTION PROJECT IMPLEMENTED BY NYARUTARAMA PROPERTY DEVELOPER (NPD LTD) IN KICUKIRO DISTRICT

The study was conducted on Risk management and performance of Construction projects implemented by NPD Ltd, the study specifically will be conducted in NPD Ltd, the target population was 600 employes and  sample size was undertaken to be 86 respondents Study used descriptive statistics and inferential statistics, both qualitative and quantitative were used to analyse the data with assistance of SPSS software program version 25.0 ,descriptive statistics and inferential statistics were used to present frequencies tables, percentages, mean and standard deviation and Inferential analysis was used in order to use Pearson correlation and multiple regression model to test the relationship between the independent variables and dependent variable.Descriptive statistics to produce frequency tables, percentages and mean. Inferential statistics were used in order to give person correlation and multiple regression models to test and draw relationship between variables both for independent band dependent, the relationship between risk planning and performance of construction projects implemented by NPD Ltd in Kicukiro district. The overall means of results was 4.50, the relationship between risk analysis and performance of construction projects implemented by NPD Ltd in Kicukiro district was 4.50, the relationship between risk analysis and performance of construction projects implemented by NPD Ltd in Kicukiro district. The overall means of results was 4.60, the relationship between risk response and performance of construction projects implemented by NPD Ltd in Kicukiro district. The overall means of results was 4.49, to examine the relationship between risk mitigation and performance of construction projects implemented by NPD Ltd in Kicukiro district. The overall means of results was 4.27 and the data on performance of project was analyzed, the overall means of results was 4.52. Depending on the results, it presented that the performance of project was on good grades. It indicated that the relationship between risk management and performance of project on road construction between risk planning, risk analysis, risk response and risk mitigation and performance was 0.617, 0.855 ,0 .867and 0.827 respectively, and the results presented than the variables were statistically significant with p value=0.000b. The results present the variables of Risk management; Risk Planning, was not statistically significant with p value=0.479b, the Risk Analysis was statistically significant with p value=0.010b, and the Risk Response was statistically significant with p value=0.000b. And the Risk Mitigation was statistically significant with p value=0.000b. It concluded that there was a significant relationship between risk management and performance of project. The study recommended that MINFRA should mobilize Rwandans to be involved in construction activities in order to earn money as the sector engage many labors. 

DOI:
2024-05-12 01:32:18 RUTAGENGWA REMY
Download
Recent News
ISSN
ISSN
ISSN
ISSN